![](https://www.nasa.gov/sites/default/files/thumbnails/image/s19-033_ssc-20190824-s00721_pathfinder_lift.jpg)
NASA cleared a milestone in preparation for Green Run testing of its Space Launch System (SLS) core stage with the lift and installation of the core stage pathfinder simulator onto the B-2 Test Stand. via NASA https://ift.tt/2ztaoZb
The blue tentacle-like arms containing gecko-like adhesive pads, attached to an Astrobee robotic free-flyer, reach out and grapple a "...
No comments:
Post a Comment